Find the right files.
Configure with confidence.
Practical reading for the next instrument on your specification sheet. Start with the measurement, then work through the details.
Product files & configuration software
Find software and PDFs by model. Confirm your instrument model before downloading and extract software packages before use.
Choose the range around the process.
Pressure measurement, specified clearly.
Read selection guideStart at the measurement point.
Temperature selection, from sensor to signal.
Read selection guideDescribe the process before choosing a method.
Flow selection starts with the fluid.
Read selection guideMore from WESIVO.
Hydrostatic Level Calculation: Density, Pressure Units and Sensor Offset
Calculate liquid-column height from gauge pressure using consistent SI units, then relate it to the tank datum. Separate density assumptions, sensor elevation and volume conversion with worked examples.
Read the guide ↗Linear 4–20 mA Scaling: Current, Range and Engineering Units
Map a configured linear 4–20 mA signal to its engineering range. Use a clearly labelled calculation example, then separate receiver scaling from transmitter verification and status handling.
Read the guide ↗Electromagnetic Flowmeters: Full Pipe, Conductivity and Grounding
Separate the three checks behind a conventional full-pipe magmeter installation. Use the selected model and configuration documents to qualify the liquid, pipe and electrical connections.
Read the guide ↗Pt100 Lead Resistance: 2-, 3- and 4-Wire RTD Connections
Understand how RTD lead resistance enters a temperature measurement, what compensation assumes, and which wiring details to confirm before ordering a transmitter.
Read the guide ↗Pressure Gauge Specifications: % of Span, % of Reading and Resolution
Compare pressure gauge error specifications in pressure units. Understand span-based and reading-based percentages, display resolution and the questions to ask before selecting a reference gauge.
Read the guide ↗Industrial MQTT Data: Freshness, Duplicates and Offline Status
Specify timestamps, units, duplicate handling and stale-data rules before accepting an industrial MQTT dashboard. Separate message delivery from measurement validity.
Read the guide ↗Plan a tank-level measurement
Prepare the medium, vessel dimensions, process conditions and required output before requesting a quotation.
Read the level transmitter selection guide ↗